韩国GINICE吉尼斯,电动执行机构,GQ-004-1112代理现货, GQ-001, 002, 004 series
韩国GINICE吉尼斯,电动执行机构,GQ-004-1112代理现货, GQ-001, 002, 004 series
韩国GINICE吉尼斯,电动执行机构,GQ-004-1112代理现货, GQ-001, 002, 004 series
Check for correct voltage prior to wiring.
2) Turn power off before servicing or for maintenance purpose.
3) Use sealant to seal conduit connections after wiring to prevent dusting
or water contamination.
4) The angle of electric actuator installation must be between 0~180 degree.
Do not install upside down or below the horizontal.
5) When more than one electric actuator needed to operate simultaneously,
please connect with the individual cables.
6) Please connect the ground wire.
7) Not intended for vacuum spaces and avoid installing (near)explosive atmospheres.
8) To avoid functional failure caused by statics, do not touch any components
on the PCB with metal tools or unarmed.
STORAGE
If you actuator cannot be installed immediately store it in a dry place, it must be
protected from excess moisture, dust and weather until you are ready to connect
incoming cables.
If the actuator has to be installed but cannot be cable, please don’t remove the plastic
cable entry plugs. When the actuator has to be cable, it is recommended that to replace
with suitable water-proof plugs and have IP67 protection.